Project documentation is the backbone of every successful project. We prepare it in two key phases: documentation for project approval (DPZ) and documentation for construction (DPS). In both cases, we work in a BIM environment with thorough coordination among disciplines and documentation management in the CDE. The DPZ translates the project concept into a coordinated solution that navigates the building permit process without unnecessary complications. DPS refines the project to the level of detail required for pricing in the bid and on-site construction. The DPS includes a preliminary bill of quantities for the tender and a control budget for the client. We collaborate with both domestic and international architectural firms—we take over a completed design and manage the project through to the completion of construction.
Project Documentation
Main pillars
-
DPZ: A Coordinated Solution for Building Permits
The documentation for project approval translates the architectural concept into a comprehensive and coordinated design. We ensure that the review process with the relevant authorities proceeds smoothly and eliminate the risk of negative opinions.
-
DPS: Documentation Prepared for Implementation
The construction documentation is prepared in sufficient detail to facilitate both the preparation of bids and the actual execution of the project. It includes a preliminary bill of quantities, a control budget, and support in selecting a general contractor, providing design supervision, and assisting with the final inspection process.
-
BIM and CDE as a Standard for Documentation Quality
All documentation is created in a BIM environment and managed in the CDE using a uniform naming convention, version control, and digital check-ins. The client has access to the current status of the documentation and any open comments at any time.
How does it work
-
1Design freeze and project specifications
Before we begin working on the project documentation, there is a phase we call the “design freeze.” This involves a detailed review of the previous phase and the finalization of any missing input parameters. We establish the design work schedule, BIM requirements, and CDE processes for the entire project team.
-
2Thesis Preparation: Draft and Comments
We are proceeding according to the agreed-upon schedule: draft drawings → rough draft → incorporation of the client’s comments → final draft. We are continuously coordinating with the various disciplines and ensuring compliance with the requirements of the relevant authorities and the building department.
-
3Consultation with the relevant authorities regarding the proposal
We ensure that the review process with the relevant administrative authorities and the building authority proceeds smoothly. We actively consult with the case officers and prevent situations in which the authority might request additional documentation or issue a negative opinion.
-
4PCB Design and Bill of Materials
Once we have obtained the permit, we will prepare the PCB design with a focus on detailed coordination, cost estimation, and feasibility. The deliverables include a preliminary bill of quantities for the general contractor’s bid and a control budget for the client.
-
5RFP for a General Contractor
We assist the client in selecting a general contractor: we answer bidders’ technical questions, evaluate bids from a technical perspective, and help establish the contractual framework for the project’s implementation.
-
6Handover of Documentation and Preparation for Construction
We are submitting the final documentation in accordance with CDE requirements—versioned, annotated, and approved by all parties. The project team is ready to move seamlessly into the implementation phase without unnecessary delays.
Why work with us
-
200+
projects completed by the studio's team
-
500
1,000 m² of HPP projects designed
-
20+
CZK billion in investment costs handled by an experienced team
-
19650
ISO BIM Standard - buildingSMART Certification
With whom you will work
-
-
Zdeněk Vondřička
Head of Engineering -
Působí ve studiu Perspektiv jako Head of Engineering a vede celý projekční tým. V praxi propojuje návrh s exekucí od koordinace profesí a kontroly technické kvality přes prováděcí dokumentaci až po autorský dozor a podporu týmu i klienta při dokončení staveb a kolaudaci. Opírá se o 20 letou praxi v oboru, zkušenosti z řízení velkých projektů typu Modřanský cukrovar, Michelské pekárny či Prague Marina NOVA a klade důraz na srozumitelnost výstupu.
-
-
-
Michal Drda
Autorizovaný inženýr a HIP -
Autorizovaný inženýr a HIP v oboru pozemních staveb s více než 15 lety praxe v projekční činnosti a vedení projektů. Specializuje se na komplexní projektovou přípravu bytových a polyfunkčních staveb včetně koordinace profesí ve všech stupních dokumentace. Jako HIP se podílel na projektech Rohan City, Čtvrť Emila Kolbena nebo Rezidence Krčská zahrada. Je držitelem autorizace ČKAIT pro pozemní stavby a energetické auditorství a energetickým expertem s oprávněním MPO.
-
-
-
Zdeno Šimo
Autorizovaný inženýr a HIP -
Autorizovaný inženýr a HIP v oboru pozemních staveb s více než 20 lety praxe v projekční činnosti a vedení projektů. Specializuje se na komplexní projektovou přípravu bytových a polyfunkčních staveb, logistických center včetně vnější infrastruktury a koordinaci profesí ve všech stupních dokumentace. Jako HIP se podílel na projektech BD SBH Living Štěrboholy, Logport Prague West, BD Vamont u Máchova Jezera. Je držitelem autorizace ČKAIT a SKSI (Slovensko) pro pozemní stavby.
-
-
-
Tomáš Katolický
BIM & CDE Manager -
BIM a CDE manažer specializující se na implementaci metodiky BIM a digitální řízení projektových dat. Má zkušenosti se zaváděním BIM procesů, správou společného datového prostředí (CDE) i nastavováním standardů podle ISO 19650. Měl na starosti digitální řízení projektů Nové Chabry či Terra Barrandov; připravoval také BIM zadání a koordinoval modely u projektů Vydrovka Office Center a TGM pro Swietelsky Real Estate. Je držitelem mezinárodní certifikace buildingSMART Foundation a pracuje s nástroji Revit, Navisworks, Dalux nebo ACC.
-