mnlt pkv nitra cam 02 f scaled

A Dignified
Townhouse

Belevis Development

Nitra, Slovakia

About project

The architectural competition for constructing a multifunctional house in the center of Nitra, which we participated in, is situated in the complicated context of the place.

  • Client

    Belevis Development

  • Year

    2019

  • Location

    Nitra, Slovakia

  • Size

    3 500 m²

  • Authors

    Ján Antal
    Martin Stára
    Sebastian Sticzay

  • Co-authors

    Silvia Snopková
    Tereza Houdková

  • Visualisations

    Monolot Studio

The city’s modernist and historical axis meet nearby, where the city-building architecture meets the monolith of the former OD Prior with the historic structures of the 19th century. The house proposed by us is to connect a broken street line, follow on the monumental terrace of a department store, and, at the same time, respond to the strict facade of the former barracks. The challenge for us was the narrow building plot, which is encumbered by a number of regulations and therefore allows only a small space for manipulation.

Situation

The townhouse, whose tectonics of the facade reflects the historical parceling, but is still only one object that can stand up to the monolithic nature of OD Prior. The body of the building enters the street and creates a generous arcade on the ground floor, which expands the public space of the street and forms a natural shelter for those waiting for the bus. The arcade is supported by massive columns, which come directly from the steel sculpture “Three Cobs” by Alexander Vika. We design the massive foundation of the business unit building from stone while we cover the office space with a light perimeter cladding with copper cladding.

The relationship between the street and the OD Prior terrace is important to us, and we decided to connect the two public platforms through a semi-public lobby. At the same time, this solution facilitates access to office space. Parking in the building is solved at the level of the first underground floor using a system of the automatic stacker, which increases the efficiency of space use.

Project information

  • Client

    Belevis Development

  • Year

    2019

  • Location

    Nitra, Slovakia

  • Size

    3 500 m²

  • Visualisations

    Monolot Studio

  • Authors

    Ján Antal
    Martin Stára
    Sebastian Sticzay

  • Co-authors

    Silvia Snopková
    Tereza Houdková

    GET IN TOUCH

    Want to work with us?